arrow left arrow right

MCM Aircraft Hangar

PROJECT OVERVIEW

JD Operations were tasked with the erection of a 1,000sqm hangar structure, along with the manufacturing, installation, and finishing of offices. This work included all aluminium apertures, steel works, and insulation panels.

FACTS

  • 2010 completion year
  • Luqa Airport location
  • 50 apertures
  • 450 sqm of cladding
  • 60 metres of railings