arrow left arrow right

Hugo's Boutique Hotel

PROJECT OVERVIEW

JD Operations were contracted to build this new, innovative boutique hotel in the heart of Paceville. Over 200 tonnes of steel was used in this project, along with sound insulated sliding doors, curtain walling, and Alucobond cladding. JD Operations were also responsible for the installation of frameless glass railings, internal glass works, and an automatic revolving door at the main entrance.

FACTS

  • 2017 completion year
  • Paceville location
  • 200 tonnes of steel
  • 2000 sqm of cladding
  • 80 apertures