arrow left arrow right

Intercontinental Hotel

PROJECT OVERVIEW

JD Operations were contracted to finish the extension to this prestigious hotel in the heart of Malta’s tourist district. JD Operations supplied and installed all aluminium apertures, and glass railings.

FACTS

  • 2016 completion year
  • Paceville location
  • 210 apertures
  • 450 meters of railings