JD Operations were contracted to design, manufacture, and install the extension to the car showroom. Over 800 tonnes of steel will be used in the construction of 10 floors, 7 of which will be underground.
The external envelope of the 3 floors above ground have also been tasked to JD Operations, with the major challenge being the installation of large format glass panes, and Alucobond works.