arrow left arrow right

RS2 Software

PROJECT OVERVIEW

JD Operations were contracted, and exclusively responsible for the installation of a continuously curved façade, made out of oversized double-glazed solar controlled glass panes. In addition to this, JD Operations were also responsible for the construction and installation of a fire escape steel staircase structure, covered with Frangisole louvres (1) and apertures.

(1) Metra

FACTS

  • 2012 completion year
  • Mosta location
  • 450 sqm of glass