arrow left arrow right

Fort Cambridge

PROJECT OVERVIEW

JD Operations won a highly competitive tender to supply, and install aluminium, and steel works to this complex of luxury apartments situated in the highly sought-after Tigné region in the heart of Sliema. Work completed includes aluminium apertures with solar controlled double glazed in all 341 apartments, spray-painted steel railings, steel railings with coloured laminated curved glass, Alucobond cladding façade fins, and hot dip galvanised steel canopies at roof level.

FACTS

  • 2012completion year
  • Sliemalocation
  • 2300apertures
  • 2500metres of railings